Project Execution

From Factory Acceptance Test to Site Acceptance Test

Each customer project is handled by a dedicated Project Manager, who is the first level of contact to the customer team. Quality and times lines, as well as project status reporting, are the main focus in addition to risk management, resource management and cost control. Guided by our dedicated team of lead engineers, experienced manufacturing teams complete the assembly, manufacturing and commissioning tests during FAT/SAT, ensuring the high level of quality required by pharmaceutical industries. During the execution phase all relevant manufacturing and commissioning test documents are prepared and approved by the customer before handover together with a compressive documentation package.

Typical tasks and deliverables during Project Execution:

• Project Management

• Assembly and Manufacturing

• Commissioning and Qualification

• Factory Acceptance Test (FAT)

• On-Site Installation

• Site Acceptance Test (SAT)

探索我们的项目阶段:

我们的集成解决方案团队致力于开发和实施快速且经济高效的生物制造解决方案,涵盖早期开发、规模放大,再到商业制造的各个阶段。

第1步:工艺优化

了解更多

第2步:工艺建模

了解更多

第3步:概念设计

了解更多

第4步:基础工程设计

了解更多

第5步:详细工程设计

了解更多

第6步:项目执行

了解更多

联系我们

我们如何为您提供帮助?*

联系我们

扩展您的知识

独家案例研究

立即阅读

颠覆行业规则的网络研讨会和视频

立即观看

探索我们的电子书和出版物

在这里下载